Good Quality Engine Timing Tool - Engine Timing Locking Setting Tool Set For Renault Clio Meganne Laguna – JOCEN
Good Quality Engine Timing Tool - Engine Timing Locking Setting Tool Set For Renault Clio Meganne Laguna – JOCEN Detail:
Description
Engine Timing Locking Setting Tool Set For Renault Clio Meganne Laguna AU004
Professional kit for commercial or occasional use.
Suitable for both petrol and diesel engines.
This kit enables the correct engine timing to be performed on Renault engines when changing the timing belt.
Suitable for the following engines K4J, K4M, F4P & F4R.
Comes in a blow molded case for easy storage and transportation.
Kit includes the following:
2 x Crankshaft timing pins.
Camshaft setting bar.
Camshaft pulley setting tool.




Suitable For The Following Vehicles
Clio Laguna Megane 1.4 / 1.6 16V
Chamade 1.9D Laguna 1.9 TDI R20 2.0 8 & 12V
Clio 1.2 / 1.4 / 1.6 16V / 1.7 Master 2.0 / 2.2 8 & 12V R20 2.2 8 & 12V
Clio 1.8 / 1.8 16V / 1.9D / TD Master 2.1 D / 2.5 D / 2.8 D / TD R21 1.7 / 1.9D / DT
Clio Sport 2.0 16V Megane 1.4 / 1.6 16V R21 2.0 8 & 12V / Turbo
Clio Van 1.9D Megane 1.9 D / TD / 2.0 16V R25 D Turbo
Clio Williams 2.0 16V R5 1.6D / 1.7 R25 2.0 8 & 12V
Espace 2.0 / 2.2 8 & 16V / DT R5 1.9D R30 D Turbo
Express 1.9D R9 1.6D Rapid 1.9D
Extra 1.9D R11 1.6D / 1.7 Scenic 1.4 / 1.6 / 2.0 16V
Fuego D Turbo R18 1.7 / DT Scenic 1.9 TD
Kangaroo 1.2 / 1.9 TD R18 Fuego 2.0 8V Traffic 2.0 / 2.2 8 & 12V
Laguna 1.6 16V / 1.8 / 1.8 16V R19 1.8 16V / 1.8 / 1.9DT Traffic 1.7 / 2.1 D
Laguna 2.0 / 16V 1.9 / 2.0 TD R20 D Turbo Twingo 1.2
Product detail pictures:
Related Product Guide:
Our company promises all users of the first-class products and the most satisfying post-sale service. We warmly welcome our regular and new customers to join us for Good Quality Engine Timing Tool - Engine Timing Locking Setting Tool Set For Renault Clio Meganne Laguna – JOCEN , The product will supply to all over the world, such as: Mombasa, Mumbai, Paraguay, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.








